Skip to main content
About Precision Testing Technologies

Three decades of UST & AST compliance testing.

Testing UST & AST systems since 1997. Serving 13 states and expanding.

A Precision Testing Technologies technician performing underground storage tank compliance testing at a fuel site in the Intermountain West.
Trusted across petroleum

Trusted by thousands of sites across 6 industries since 1997.

  • Convenience stores
  • Fleet operators
  • Truck Stops
  • Hospital generators
  • Airport jet fuel
  • Government and defense
1997 testing UST & AST systems since
Origin

Built around state and federal UST regulations and manufacturer certifications since 1997.

Built around state and federal UST regulations and manufacturer certifications since 1997.

Thousands of sites. Serving 13 states and expanding.

Selected work

Industries we serve.

See the industries we serve →
Fleet operator

Regional fleet network

ATG functionality verification plus air quality testing per state schedule across fleet depot yards in the Mountain West.

Hospital

Hospital generator network

Annual compliance package across medical facilities in Utah and Colorado: tank tightness, line tightness, spill bucket, containment sump. Continuous multi-year coverage.

Government and defense

Agency fuel infrastructure

Triennial compliance bundling across government fuel sites: spill bucket, containment sump, overfill, line tightness. Multi-year contract relationship.

How we work

Three principles, every site.

  1. 1

    Read the state regulations first.

    Every state has its own UST forms, deadlines, and inspector preferences. We track them per site so the testing schedule matches the compliance calendar, not the other way around.

  2. 2

    Bring every tool the test requires.

    Manometers, hydrostatic trailers, helium detectors, ATG manuals, manufacturer certifications. The truck arrives with everything the day's work needs, so no test waits for a second visit.

  3. 3

    Document for the inspector before we leave.

    Pass-fail records, corrective notices, photo documentation, state-specific inspection forms. We hand off what your operator needs to file, not a generic report.

By the numbers

Three decades. Same crew, every visit.

Since 1997
Testing UST & AST systems
Thousands
of sites
13
States served
PTTI scissor lift crew working on a fueling canopy with the service truck and field equipment staged for UST compliance testing.
How PTTI works

About our process.

Owner-led since 1997, the same crew year over year, certified for the equipment in the field. How the company actually runs an engagement.

  1. 1

    Owner-led since 1997.

    The person who reads the state regulations runs the work. PTTI has been owner-operated since 1997, so the standard does not move with staff turnover or a sales handoff. Compliance is the product, and the owner answers for it.

  2. 2

    The same crew, year over year.

    No rotating contractors. The technician who learns your tank manifold and equipment this year is the one who returns next cycle. Continuity means fewer questions on site, cleaner records, and faster visits.

  3. 3

    Certified for the equipment in the field.

    Manufacturer certifications on Veeder-Root, Franklin INCON, and Estabrook. The crew is qualified for the equipment it tests, not certified in the abstract.

  4. 4

    Documentation the inspector accepts.

    Every engagement ends with pass-fail records and the state-specific forms your operator needs to file. The deliverable is built for the audit, not a generic report left behind.

Get a quote

Three decades of work. Tell us about yours.

Serving 13 states and expanding. Thousands of sites, every test audit-ready. Tell us about your site and we'll have a quote back to you fast.

Call (801) 886-9224 Get a quote